Lean Mass/Cutting Cycle
- Brand: Ultima Pharmaceuticals - Cycles
- Product Code: Lean Mass/Cutting Cycle
- Availability: In Stock
-
$300.00
**2 x Ultima-Primo 100** - Ultima Pharmaceuticals [10 ml x 100 mg/ml]
**2 x Ultima-Drostan P 100** - Ultima Pharmaceuticals [10 ml x 100 mg/ml]
**2 x Ultima-Nolva** - Ultima Pharmaceuticals [50 pills x 20 mg]
MANUFACTURER
Ultima Pharmaceuticals - Cycles
WAREHOUSE
International Warehouse 3
SUBSTANCE
Drostanolone Propionate, Methenolone Enanthate, Tamoxifen Citrate
Brand: Ultima Pharmaceuticals
8-Week Lean Mass/Cutting Steroid Cycle by Ultima Pharmaceuticals
- Weeks 1-3: 200 mg per week
- Weeks 4-7: 300 mg per week
- Week 8: 200 mg per week
- Weeks 1-3: 200 mg per week
- Weeks 4-7: 300 mg per week
- Week 8: 200 mg per week
- 10 mg daily throughout the entire cycle.
Please be aware that while we share our personal experiences, we are not professionals. Our insights should not substitute for expert advice. OSGear disclaims any responsibility for issues arising during the cycle, misuse of products, or any resulting effects.

